ABOUT THE PROJECT
A challenging highways scheme forming part of the major widening of the A19.
Works included installation of drainage in narrow verges using pipes ranging from 150mm to 1200mm diameter, construction of manholes, and maintaining a live road throughout. Nightshifts were required to minimize disruption. The project was delivered by experienced teams under demanding conditions.